STUDY ON THE BOTTOM DIVERSION OUTLETS OF THE THREE GORGES PROJECT

Study on the Bottom Diversion Outlets of the Three Gorges Project

Construction of the Three Gorges Project is divided into three stages.The second stage is to close the left bank main riverbed, divert the Breast Pump Accessories stream to the right bank open channd and build the spillway section in the mian river bed and the powerhouse on theleft bank.The spillway section will be provided with three rows of relea

read more



Giant subdural empyema in adult

Subdural empyema (SDE) is a fairly uncommon diagnosis, accounting for only 20% of intracranial infections, the usual source for SDE DC Plug Splitter Lead is direct extension from a contiguous source, such as acute sinusitis or otitis media, although in one-fourth of cases no source of infection is found.An 18-year-old man was admitted to our Instit

read more